The King Salman International Complex for Maritime Yard (MYP) is a large-scale project aimed at establishing Saudi Arabia as a leader in global maritime production. Here are some key details:
- Location: Ras Al-Khair industrial city on the eastern coast of Saudi Arabia.
- Goal: Become a world-class facility for offshore fabrication, new shipbuilding, and maintenance, repair, and overhaul (MRO) services.
- Capacity: To handle Very Large Crude Carriers (VLCCs) and other large vessels.
- Zamil Steel's Role: Fabrication and supply of approximately 8,400 metric tons of pre-engineered steel structures for a major building (HULL ODDMENTS, MOULD LOFT SHOP).
Challenges:
- Tight project schedule to meet the opening ceremony deadline.
- Complex design with intricate steel structures, featuring cantilevered elements and requiring close coordination with concrete elements and the facade.
- Fabrication challenges due to the large size and weight of assemblies (up to 44.5 tons).
- Erection challenges involving heavy lifts and ensuring structural integrity.
Solutions with Tekla Structures:
- Tekla's 3D modeling capabilities facilitated the creation of accurate models for the complex steel structures.
- The software's rich connection library streamlined the design and detailing process.
- Tekla Structures helped avoid clashes and ensured smooth collaboration among architects, engineers, and fabrication teams.
- The model enabled precise detailing and data transfer for automated steel cutting and punching.
Benefits of Using Tekla BIM:
- Exceptional Design Realization: Achieved complex geometries with high precision.
- Enhanced Collaboration: Streamlined communication and minimized errors.
- Improved Efficiency: Facilitated faster fabrication and construction.