Project description
The project consists of the covering of a sports court in the neighborhood of Les Planes, Sant Cugat del Valles. Steel supporting structure anchored by injectable adhesive anchors to existing walls, wooden deck straps. In this phase, the deck and lower gangway are mounted.
The use of BIM has helped us to launch the cuts of the tubes to the CN machine.
Special challenges
The structural complexity of the geometry of the structure and the difficulty in the manufacture of each element.
What made the project succesfull?
The cooperation between every step of the workflow from the modeling in which the BIM tools have made our work easier.