Project description
Reconstruction of the "Dynamo" stadium combined under one roof the Great sports arena (open-air) and the Small sports arena (indoor). Our factory made designs for the Small sports arena located in the historical part of the structure. Three tiers of stands, a contour truss, roof trusses (main and cantilever parts), cold roof structures. Keeping the historical façade located directly under the new structures was the main specialty of this project. That led to a number of engineering difficulties. The first constructions for this object were shipped as far back as in 2015, the construction of the cold roof in 2017.
Challenges and success factors
Due to the large volumes and complexity of the structures, the facility was divided into several parts, and was manufactured at different metalwork plants. In addition, the execution of the design documentation involved both the factories themselves and at subcontractors.
Advantages of BIM technologies
Due to the use of 3D modeling, it was possible to coordinate the work of a large number of parties. Several organizations worked simultaneously on one object using regularly updated reference models of neighboring parts. Thanks to this approach, it was possible to avoid any collisions during installation.
Project in figures
In total, about 5,500 tons of metal structures were shipped for this facility. In the production of a sheet 100mm thick with a quality group Z35, which had to be ordered from Luxembourg.
Â
About the company
JSC "ChZMK" is one of the largest plant manufacturing steel construction and bridge structures of high quality and is known not only in Russia, but also far beyond its borders. The plant has a large number of unique structures: BSA Luzhniki, Skating Center in Krylatskoye, Olympic Stadium in Fisht, Sochi etc.
Â