This project is part of the logistics center that Inditex owns in Lelystad (Netherlands), and it consists of three different interconnected structures. The first one is a 32-meter-high high bay for hanging garment storage, at the front of this lies the second structure, a multi-level mezzanine providing logistical support. The third is the connecting bridge that links with other parts of the center. All structures are entirely made of steel with bolted connections, avoiding on-site welding.