It is a replacement of the existing footbridge in Nabburg by a new one. The span of the bridge is 25.34 meters and the width is 1.7 meters’ clearance. The load bearing structure consists of 406,4x8 pipe mounted on a concrete foundation and supported at two locations by fork struts. For exact dimensions of construction, we received 3D DWG focused on the existing concrete structure that we used as a reference model. The deck is made of oak planks that are bolted through the rubber mat to longitudinal beams with specific profile L80x60x7 and U120.