Big Springs Village Phase 2 is a 420,000 sf mixed-use alpine village situated at the base of Yellowstone Club, a private ski, golf, and outdoor recreational community in Big Sky, Montana. The project includes Buildings 5, 6, and 7 and the Central Utility Plant, which will consist of 35 for-sale residential condominium units and an array of amenities and support spaces. The overall tonnage of that project is almost 3000 tons. Construction commenced in late 2022 and is scheduled for completion in 2026. The project represents the second phase of the Yellowstone Club Village development. Phase 1 was completed in 2019, and all 48 residential units were sold (closed) that same year.Â
From the detailing perspective, the project included:
- Complex roof structures – a large amount of skewed connections.
- Special moment frame connections in the seismic force-resisting system (SFRS).
- Special BRB frame connections.
- Complex coordination with other branches due to the large amount of architectural fascia, both wooden and stone.