The rapid loading system (RLS) building is designed to cater to the logistics requirement of pellets to other plants of Tata Steel. Tata Steel completed the execution of the pellet plant (2 X 3MTPA) before the execution of blast furnace (5 MTPA). To utilize the pellet plant to its fullest capacity, Tata Steel constructed this logistic circuit. This logistic silo has two silos of 4000MT each.
Challenges
- Generating clash-free and zero error drawings
- Seamless fabrication using CNC machine and Tekla PowerFab
- Hazard-free and timely delivery of the project
Benefits of using Tekla
Tekla Structures is a powerful tool for creating and modifying connections between steel members. The software enabled the project team to deliver error free drawings and ensured seamless fabrication saving considerable time.